Previous month the roof of the building was set. This month the ceiling and outside walls have been isolated with sound isolation. Also the main cables have been drawn for power and network endpoints.

We reused wall sockets which we sprayed black so that they can be neatly built into the studio walls and ceilings.

As this month we also had our holidays scheduled so there have been no further updates. After the holidays we will continue to built the studio further with some fresh energy!